
SINGAPORE, 2016
Singapore Power is constructing two cross-island transmission cable tunnels to ensure that households and businesses continue to enjoy reliable power supply. The tunnels are 60 metres underground with diameters of 6 m respectively 9 m and provide a long-term solution to the ongoing renewal of the power cable grid infrastructure in Singapore.
INNIVATE provides the natural ventilation to these tunnels with a comprehensive Performance Louvre system.
LOCATION | Singapore, Singapore |
COMPLETION | 2016 |
PRODUCT AREA | 206 m2 |
INDUSTRY | Electrical Sub-Station |
PRODUCTS | Performance Louvre AI-7520 |





